These 2 and 3 bedroom apartments were all sold off-plan due to the
location, size and assured quality of the development. All our properties
are ‘signed off’ by the local council and are fully certified for
habitation.
The site work is started by having the arranged
projects prepared and approved by the local
council such as architectural, statics, electricty and plumbing projects.
3d renderings are drawn for pre-construction
marketing and simulating the work which soon to
be on progress. |

|
|
| |
|
| |
|
|
|
|

|
Excavation of the foundations in accordance with
building plan particularly in reaching and
indeed exceeding the regulation minimum
strengthening rods in the laying of the
foundations for a super strong structure.
This pre-construction work usually takes from 10
to 15 days depending on the type of the project
and the weather conditions. |

|
|
| |
|
| |
|
|
|
|
 |
Construction of trusted reinforced concrete
foundations in accordance with the
structural calculations.
|
 |
|
| |
|
| |
|
|
|
|
 |
Each floor of the build is maintained in
compliance with the regulated concrete mix and
waiting period prior to the next level up. |
 |
|
| |
|
| |
|
|
|
|
 |
Plumbing and electricty systems are installed
right after the bricks walls are layed and
exterior plastering with 2-layered cement
mortar, high-quality dispersion paint.
|
 |
|
| |
|
| |
|
|
|
|
 |
It is of course important to use the correct
insulation and during all stages of the build
insulation materials were used to maintain a
'sound' building from the foundations through to
the final stages. |
 |
|
| |
|
| |
|
|
|
|
 |
Boundary walls are of natural stone and were
worked on by local men who know and understand
the strength of each stone hand laid. |
 |
|
| |
|
| |
|
|
|
|
 |
All floors are covered with natural travertine
tiles applied on water and sound insulated
cementation.
|
 |
|
| |
|
| |
|
|
|
|
 |
Bathrooms are perfectly insulated and finished
with high quality tiles. Balcony and terrace
stud walls are finished with travertine
toppings. |
 |
|
| |
|
| |
|
|
|
|
 |
We chose natural stone for the pool terrace and
other exterior areas to blend with the boundary
walls which are also natural stone, thus
creating a more aesthetically pleasing building.
Pool is insulated with three coats of high
quality insulation materials and mosaic tiled. |
 |
|
| |
|
| |
|
|
|
|
 |
Roof covering is done by Onduline (bituminous
cornegated sheet) which provides a perfect water
insulation, having high density polystyrene
applied for heat insulation and finished with
tiles or shingles. |
 |
|
| |
|
| |
|
|
|
|
 |
First quality
interior painting is applied over satin plaster. MDF covered kitchens are
installed and finished with granite worktops as well as the bathroom furnitures do. |
 |
|
| |
|
| |
|
|
|
|
 |
High quality double
glazed PVC frames are installed, landscaping is already on its way to create
a peaceful ambience. |
 |
|
| |
|
| |
|
|
|
|
 |
At the final stage
of the build of the project it received the appropriate certificates
necessary to prove it has been built to the approved architectural plans and
is habitable and signed off by the local council. |
 |
|
| |
|
| |
|
|
|
|
 |
The construction
process which starts by November is finished by the beginning of May and the
individuals are ready for use with title deeds transferred onto new owners
names, living permission obtained, electricity and water registrations done
and necessary insurances applied. |
 |
|
| |
|